FREE TOOL

Daily T&M Tag Generator

Build a same-day time & materials tag — labor, equipment, and materials with a reserve-rights notice — and download a clean PDF to get signed in the field. No account needed.

Labor
$0.00
Equipment

None yet.

Materials

None yet.

Day total (recorded)
$0.00

The PDF includes reserve-rights language: a signature verifies the work occurred — it is not approval of a change order or price. Nothing you type here is stored.

Why a daily T&M tag?

On T&M and change-order work, the dispute is never about whether you did the work — it's about whether you can prove it. A tag signed the same day by the GC or owner's rep is the strongest evidence there is: it verifies the labor, equipment, and materials while everyone still remembers the day.

The generated PDF includes reserve-rights language, so a signature confirms the work occurred without approving pricing — the number stays subject to your contract's change-order process.

Tired of retyping this every day?

RevnuPros creates tags in seconds (crew copies forward from yesterday), collects e-signatures by text or link, flows labor straight into job costs, and rolls signed tags into a priced change order with your contract markups.

Start free →

Also free: lien deadline calculator · state lien guides